Wednesday, September 17, 2008

The Fifth Pole!!

This the fifth pole being put into place, using the pulley system. This is the last really big pole we have to put up (except for the rafters). GG pulls on the rope. Duane and I maneuver the post over the rebar (the post has been drilled on the bottom to fit on it).

Setting the fifth post on the rebar.


We get everything flush as possible, then we put a one foot Lag Screw into the top beam, into the vertical post.


Admiring our work.


Duane, working on putting the Lag Screw in.



No comments: